Prikaz osnovnih podataka o dokumentu

dc.creatorPlećaš, Ilija B.
dc.creatorDimović, Slavko
dc.date.accessioned2018-03-01T19:52:31Z
dc.date.available2018-03-01T19:52:31Z
dc.date.issued2006
dc.identifier.issn1091-028X
dc.identifier.urihttps://vinar.vin.bg.ac.rs/handle/123456789/3058
dc.description.abstractTo assess the safety of disposal of radioactive waste material in cement, curing conditions and time of leaching radionuclides Cs-137 have been studied. Leaching tests in cement-ion exchange resins-bentonite matrix were carried out in accordance with a method recommended by IAEA. Curing conditions and curing time prior to commencing the leaching test are critically important in leach studies because the extent of hydration of the cement materials determines how much hydration product develops and whether it is available to block the pore network, therepy reducing leaching. Incremental leaching rates R-n (cm/d) of Cs-137 from cement-ion exchange resins-bentonite matrix after 180 days were measured. The results presented in this paper are examples of results obtained in a 20 yr concrete testing project that will influence the design of the engineer trenches system for future central Serbian radioactive waste storing centers.en
dc.rightsrestrictedAccessen
dc.sourceJournal of Porous Mediaen
dc.titleCuring time effect on the fraction of Cs-137 from cement-ion exchange resins-bentonite clay compositionen
dc.typearticleen
dcterms.abstractПлецас, И.; Димовић Славко;
dc.citation.volume9
dc.citation.issue2
dc.citation.spage177
dc.citation.epage180
dc.identifier.wos000239638800007
dc.identifier.doi10.1615/JPorMedia.v9.i2.70
dc.citation.rankM23
dc.identifier.scopus2-s2.0-33746265198


Dokumenti

DatotekeVeličinaFormatPregled

Uz ovaj zapis nema datoteka.

Ovaj dokument se pojavljuje u sledećim kolekcijama

Prikaz osnovnih podataka o dokumentu