Possibilities for reconstruction of existing steam boilers for the purpose of using exhaust gases from 14 MW or 17 MW gas turbine
Apstrakt
Within the energy system in Methanol vinegar complex (MVC) in Kikinda, beside process boiler and auxiliary equipment, there are three equal steam boilers made by Minel Kotlogradnja, provided for combustion of natural gas, fuel oil and process gases. Aiming to increase the MVC Kikinda energy plant capacity, one gas turbine of 14 MW or 17 MW is going to be installed. In regard to relatively high gas temperature and a large amount of the unused oxygen from the air in the exhaust gas, it is specified to split exhaust gas into the two equal streams and import them into the two existing steam boilers, each having production of 16.67 kg/s (60 t/h). In order to use the exhaust gas heat, as well as oxygen contained within, it is necessary to replace the existing burners and to reconstruct the heat exchangers in the steam boiler vertical convective pass. Besides, it is necessary to verify if the existing flue gases fan can comply with the new operating regime, during which a half of the turbine ...exhaust gas is imported into the steam boiler. (c) 2013 Elsevier Ltd. All rights reserved.
Ključne reči:
Gas turbine / Exhaust gas / Steam boilerIzvor:
Applied Thermal Engineering, 2013, 56, 1-2, 83-90
DOI: 10.1016/j.applthermaleng.2013.03.028
ISSN: 1359-4311
WoS: 000320208700010
Scopus: 2-s2.0-84876350120
Kolekcije
Institucija/grupa
VinčaTY - JOUR AU - Tucaković, Dragan R. AU - Stupar, Goran AU - Živanović, Titoslav AU - Petrović, Milan AU - Belošević, Srđan PY - 2013 UR - https://vinar.vin.bg.ac.rs/handle/123456789/5541 AB - Within the energy system in Methanol vinegar complex (MVC) in Kikinda, beside process boiler and auxiliary equipment, there are three equal steam boilers made by Minel Kotlogradnja, provided for combustion of natural gas, fuel oil and process gases. Aiming to increase the MVC Kikinda energy plant capacity, one gas turbine of 14 MW or 17 MW is going to be installed. In regard to relatively high gas temperature and a large amount of the unused oxygen from the air in the exhaust gas, it is specified to split exhaust gas into the two equal streams and import them into the two existing steam boilers, each having production of 16.67 kg/s (60 t/h). In order to use the exhaust gas heat, as well as oxygen contained within, it is necessary to replace the existing burners and to reconstruct the heat exchangers in the steam boiler vertical convective pass. Besides, it is necessary to verify if the existing flue gases fan can comply with the new operating regime, during which a half of the turbine exhaust gas is imported into the steam boiler. (c) 2013 Elsevier Ltd. All rights reserved. T2 - Applied Thermal Engineering T1 - Possibilities for reconstruction of existing steam boilers for the purpose of using exhaust gases from 14 MW or 17 MW gas turbine VL - 56 IS - 1-2 SP - 83 EP - 90 DO - 10.1016/j.applthermaleng.2013.03.028 ER -
@article{ author = "Tucaković, Dragan R. and Stupar, Goran and Živanović, Titoslav and Petrović, Milan and Belošević, Srđan", year = "2013", abstract = "Within the energy system in Methanol vinegar complex (MVC) in Kikinda, beside process boiler and auxiliary equipment, there are three equal steam boilers made by Minel Kotlogradnja, provided for combustion of natural gas, fuel oil and process gases. Aiming to increase the MVC Kikinda energy plant capacity, one gas turbine of 14 MW or 17 MW is going to be installed. In regard to relatively high gas temperature and a large amount of the unused oxygen from the air in the exhaust gas, it is specified to split exhaust gas into the two equal streams and import them into the two existing steam boilers, each having production of 16.67 kg/s (60 t/h). In order to use the exhaust gas heat, as well as oxygen contained within, it is necessary to replace the existing burners and to reconstruct the heat exchangers in the steam boiler vertical convective pass. Besides, it is necessary to verify if the existing flue gases fan can comply with the new operating regime, during which a half of the turbine exhaust gas is imported into the steam boiler. (c) 2013 Elsevier Ltd. All rights reserved.", journal = "Applied Thermal Engineering", title = "Possibilities for reconstruction of existing steam boilers for the purpose of using exhaust gases from 14 MW or 17 MW gas turbine", volume = "56", number = "1-2", pages = "83-90", doi = "10.1016/j.applthermaleng.2013.03.028" }
Tucaković, D. R., Stupar, G., Živanović, T., Petrović, M.,& Belošević, S.. (2013). Possibilities for reconstruction of existing steam boilers for the purpose of using exhaust gases from 14 MW or 17 MW gas turbine. in Applied Thermal Engineering, 56(1-2), 83-90. https://doi.org/10.1016/j.applthermaleng.2013.03.028
Tucaković DR, Stupar G, Živanović T, Petrović M, Belošević S. Possibilities for reconstruction of existing steam boilers for the purpose of using exhaust gases from 14 MW or 17 MW gas turbine. in Applied Thermal Engineering. 2013;56(1-2):83-90. doi:10.1016/j.applthermaleng.2013.03.028 .
Tucaković, Dragan R., Stupar, Goran, Živanović, Titoslav, Petrović, Milan, Belošević, Srđan, "Possibilities for reconstruction of existing steam boilers for the purpose of using exhaust gases from 14 MW or 17 MW gas turbine" in Applied Thermal Engineering, 56, no. 1-2 (2013):83-90, https://doi.org/10.1016/j.applthermaleng.2013.03.028 . .